Untreated sewage mixed with stormwater poured into the Chelsea River for about three hours on Thanksgiving night, and the Chelsea Board of Health is telling residents to stay out of the river until early Sunday.
The city posted the public health warning Friday. It says the overflow started Thursday, November 26, at 9:20 p.m. and ended Friday, November 27, at 12:30 a.m. The advisory expires Sunday, November 29, at 12:30 a.m., which is 48 hours after the discharge stopped.
Where it happened
The discharge came from the outfall the city labels CHE008. The warning places it on the Chelsea River off Eastern Avenue, in line with the old Willoughby Street. The city says the event affects the waters along the Chelsea River.
The warning does not say how much sewage and stormwater went into the river or how much rain fell.
What residents are asked to do
- Stay out of the water. Avoid swimming, fishing, boating and any other contact with the river until the advisory ends.
- Know the general rule. Health officials advise avoiding contact with local water bodies during rainstorms and for 48 hours after the rain ends, because runoff and overflows can carry bacteria and other pollutants.
- Use less water in heavy rain. In a separate post Friday, the city asked residents to hold off on laundry, dishwashing and showers during heavy rainfall, which leaves more room in the pipes.
The city says contact with the water after an overflow can raise the risk of illness, infections and skin irritation.
Why this happens in Chelsea
About 70 percent of Chelsea is served by combined sewers, pipes that carry both wastewater and rain runoff, according to the city’s Water and Sewer Department. In dry weather that flow goes to the Massachusetts Water Resources Authority’s Deer Island Treatment Plant.
In a large storm, runoff can exceed what the pipes hold. Combined systems are built with overflow structures that release the excess into a nearby water body so that it does not back up into buildings or come out of manholes. State regulations require local health departments to notify the public when a discharge may create a health risk, including when it lasts more than two hours.
What the city says it is doing
Chelsea has a master plan to separate its remaining combined sewers, which the city says will in time nearly eliminate these discharges. The department lists separation work on upper Broadway from 2020 to 2023, on Central Avenue from 2022 to 2024 and on downtown Broadway in 2024 and 2025. Park Street and Pearl Street are next, with work starting in summer 2027.
The department’s page says the MWRA replaced 30 feet of pipe at the CHE008 regulator and installed new structures at Willoughby Street and Eastern Avenue in 2023.
How to get the alerts
The city’s combined sewer overflow page, chelseama.gov/cso, has a sign-up for notifications, a list of past activations and the annual reports.